EAZET is an environmentally friendly pile method with low noise, low vibration, and no waste soil. The installation process is extremely simple. Works by a compact machines less than 10m height are safe and executing speedy pile installation.
EAZET pile Standard installation Process
 
                    - 1. Attach a pile to torque motor
- 2. Set the pile to the planned location.
- 3. Begin rotation while applying downward crowd
- 4. Add extension sections if necessary
- 5. Completion of the pile installation
EAZET work on site
Standard EAZET installation
- 
                                      1. Delivering the pile machine. 
- 
                                      2. Enter the construction site. 
- 
                                      3. Deliver EAZET piles. 
- 
                                      4. Setting the EAZET pile. 
- 
                                      5. Centering of pile. 
- 
                                      6. EAZET pile installation without waste soil. 
- 
                                      7. Connect the piles. 
- 
                                      8. Continue or finish the installation. 
 
                    